Monte Cañón

Degraded

Galicia · Wind · 74 MW installed · 6 technicians · manager Kiarra Swaniawski

Output now

25.8 MW

Load factor

35 %

Energy today

607 MWh

Availability

96.9 %

Producing

12 / 16

Open alarms

4

Generation
Last 12 hours
Wind, solar and battery power at the point of interconnection. A charging battery shows below zero.
Conditions
Resource and grid

Wind

9.4 m/s SSW

Irradiance

0 W/m²

Temperature

14.2 °C

Cloud cover

62 %

Conditions

Partly cloudy

Substation

Mesón SE 220 kV

Voltage

220.4 kV

Frequency

49.962 Hz

Power factor

0.988

Curtailment

19 %

Day-ahead price

65.32 €/MWh

Assets

16 assets on site. Open one for its live 3D view.

Power flow

Wind turbine

WTG-01

Siemens Gamesa SG 5.0-145 · 6.2 MW

Producing
59%

Output

3.66 MW

Today

48.6 MWh

Wind

10.6 m/s

Wind turbine

WTG-02

Siemens Gamesa SG 6.6-170 · 4.2 MW

Producing
43%

Output

1.80 MW

Today

46.9 MWh

Wind

9.5 m/s

Wind turbine

WTG-03

Nordex N149/4.0-4.5 · 6.2 MW

Producing
29%

Output

1.77 MW

Today

36.3 MWh

Wind

8.7 m/s

Wind turbine

WTG-04

Siemens Gamesa SG 5.0-145 · 5.0 MW

Producing
1%

Output

0.07 MW

Today

54.6 MWh

Wind

4.8 m/s

Wind turbine

WTG-05

Nordex N149/4.0-4.5 · 6.2 MW

Producing
91%

Output

5.64 MW

Today

44.1 MWh

Wind

12.3 m/s

Wind turbine

WTG-06

Vestas V162-6.2 · 5.0 MW

Producing
5%

Output

0.26 MW

Today

41.1 MWh

Wind

6.0 m/s

Wind turbine

WTG-07

Vestas V162-6.2 · 4.2 MW

Curtailed
2%

Output

0.09 MW

Today

23.4 MWh

Wind

5.7 m/s

Wind turbine

WTG-08

Nordex N149/4.0-4.5 · 6.2 MW

Producing
6%

Output

0.40 MW

Today

53.4 MWh

Wind

6.1 m/s

Wind turbine

WTG-09

Vestas V150-4.2 · 6.2 MW

Producing
21%

Output

1.32 MW

Today

49.4 MWh

Wind

8.0 m/s

Wind turbine

WTG-10

Siemens Gamesa SG 5.0-145 · 6.2 MW

Producing
91%

Output

5.64 MW

Today

58.1 MWh

Wind

14.6 m/s

Wind turbine

WTG-11

Siemens Gamesa SG 6.6-170 · 5.0 MW

Producing
13%

Output

0.65 MW

Today

47.0 MWh

Wind

7.1 m/s

Wind turbine

WTG-12

Vestas V162-6.2 · 5.0 MW

Standby
0%

Output

0.00 MW

Today

39.2 MWh

Wind

9.5 m/s

Wind turbine

WTG-13

Siemens Gamesa SG 5.0-145 · 4.2 MW

Producing
92%

Output

3.84 MW

Today

36.5 MWh

Wind

12.3 m/s

Wind turbine

WTG-14

Vestas V150-4.2 · 4.2 MW

Curtailed
17%

Output

0.70 MW

Today

28.4 MWh

Wind

9.1 m/s

Inverter skid

INV-01

SMA Sunny Central 4600 UP · 5.0 MVA

Producing
41%

Output

2.04 MW

Today

37.5 MWh

Availability

99.6 %

Inverter skid

INV-02

Sungrow SG3125HV-MV · 5.0 MVA

Curtailed
1%

Output

0.03 MW

Today

20.6 MWh

Availability

94.2 %

Alarms
Site alarms
Most recent events from this site's assets.

Blade ice detected

WTG-02· 10-21 15:31
medium

IGBT temperature high

INV-02· 10-21 08:40
low

Pitch system hydraulic pressure low

WTG-05· 10-21 01:14
low

Yaw misalignment above limit

WTG-07· 10-20 20:55
low